Work

The same work, seen and done in different ways.

Event management and field operations application

A calendar of events and tasks assigned to field technicians.

It kept gaining requirements through successive versions and real use.

The application was not defined at the beginning.

My responsibility did not end with the first version either.

The whole frontend is mine. I started from a backend and legacy code to build a new interface, but the work did not end when that first version went into production.

I have had to adapt it to every new need without ceasing to sustain what already worked. And I still do.

Each new problem has demanded a different solution: modifying existing structures, adding new states, making different ways of working coexist, and taking on the inevitable debt of a real application that keeps evolving while it is in use.

New changes couldn’t break what already worked

  • Persistent selection
  • Assignment + notice
  • Persistent filters
  • Recoverable work
  • Travel by context
  • History + return
Work

The same work, seen and done in different ways.

Event management and field operations application

A calendar of events and tasks assigned to field technicians.

It kept gaining requirements through successive versions and real use.

  1. The starting point

    An agenda to view, create, edit and delete events from a calendar.

    The work began on legacy code. The backend already existed and I was asked to build a new frontend from scratch, one that would consume its API.

    There was no finished specification: the requirements appeared as users worked with the Agenda.

  2. Already in production

    A day was no longer just a dot on the calendar.

    Once in production, a new need appeared: before opening an event, you had to be able to see all the events of that day.

    The events of the selected day move into a browsable list.

  3. A new working context

    Unassigned events are born: work that did not belong to anyone yet.

    When an event is created you do not always know which technician will do it, and a personal agenda has nowhere to show it.

    Unassigned events needed their own space, but they could not become a separate application: they had to keep the same navigation, detail and operations on events.

    A new capability was added on top: assigning them to a technician.

    Assigning them created another problem in turn: the technician had to know they had received new work.

    • Before Technician A: Repair · Customer D · Thu 16
    • → Assigned to Technician B
    • After Technician A: no events on this day
    • Technician B: Repair · Customer D · Thu 16
  4. With use

    Other ways of working with the Agenda.

    As the application was used, events appeared of different types, ways of working, customers, dates and technicians. Browsing by day was no longer enough.

    A system of filters was added to decide which events to work on.

    Later, that same model had to be extended to interventions and commercial actions.

  5. From consulting to working

    From planning the work to following it: starting, tracking and closing events.

    Until then, the Agenda was mainly a tool for consulting and managing. Now it also had to become a tool for working.

    An event could be started, only one at a time, and stay active until it was closed.

    That also brought a new responsibility: leaving the application or reloading it could not make work that was still open disappear.

    When the event is closed, the Agenda returns to the point where the work started, active filters included, with the event already updated.

  6. Events with travel.

    The same work, two solutions.

    Event management evolved again when travel had to be incorporated.

    On mobile, the technician records the trip progressively as it happens: departure, arrival, work and return until the event is closed.

    On desktop, that same trip is completed in one go once the work is already finished.

    The domain is the same, but the context of use demands two different solutions.

    And both had to be added to an application that was already running in production.

  7. Then what had already happened started to matter.

    Knowing what is happening now made it necessary to go back to what happened before.

    Once the Agenda already manages current work, another need appears: consulting the earlier work.

    Histories of events and interventions were added, so that finished work could be revisited.

The application was not defined at the beginning.

My responsibility did not end with the first version either.

The whole frontend is mine. I started from a backend and legacy code to build a new interface, but the work did not end when that first version went into production.

I have had to adapt it to every new need without ceasing to sustain what already worked. And I still do.

Each new problem has demanded a different solution: modifying existing structures, adding new states, making different ways of working coexist, and taking on the inevitable debt of a real application that keeps evolving while it is in use.

New changes couldn’t break what already worked

  • Persistent selection
  • Assignment + notice
  • Persistent filters
  • Recoverable work
  • Travel by context
  • History + return